Last year, we experienced extremely low water levels on several occasions. At the “de Tien” dock, this caused the footbridge (belonging to the Rotterdam Heritage Harbors Foundation) to slide off the platform. When the water rose again, the bridge became jammed, and a pole bracket was crushed.

First, we repaired the pole bracket. Then, after conducting a number of tests, we arrived at a structural solution: the platform was extended significantly and fitted with a raised edge. This prevents the walkway from sliding off the platform, even during extreme high water levels.

If you notice a dangerous situation anywhere in the harbor that requires attention, please contact the harbor master!

Special thanks to Jiri, Frans, and Joram (for punching 12mm-thick steel)